回首頁
MANAGEMENT PRINCIPAL:
Set a Goal of Managing Continuously with an internationalization view to improve the products quality. Serve and satisfy the customers needs and keep Zenith Growing forever.

PRODUCT:
Any Kinds of Pistons for Engines, Pin, Ring, Liner, Liner Kits.

More than 3000 kinds of Pistons are included within our production line.








COMPANY PROFILE


1985/8/06---
Zenith establish with US100000 procured by stockholder with 10 employees, one production line.


 1987/07-----
Specializing in the pistons of motorcycles. 600 square meters factory are built with 3 production lines. 

 1988/04-----
Start producing pistons of small engines and build additional 500 square meters factory. The melting automatically control system is started.


1989/03-----
600 square meters handing factory with 5 production lines. Starts participate in the domestic spare parts show once a year.


1990/01-----
Precision instruments are implemented and participate in the international spare parts show. Production reward system is presented.

1991/04-----
Casting standardization is assisted and guided by I.T.R.I. Start implementing clean packing automated system. 

1992/03-----
8 Production line are loaded.

1993/02-----
Start computerizing management system and investing US 500000 to establish Da Tong Auto Parts Corporation in Shanghai with HC as its brand.

1994/08-----
Use the NC machine and start the automatically production system.

 1995/01-----
Implementing CNC lathe and build a new 800 square meters factory. Meanwhile, International Standardization System (ISO) is guided in Taiwan. 

1996/04-----
ISO 9002 is approved in Taiwan. TIK starts providing liner kits service. Meanwhile, Shanghai Da Tong Corporation increases 3 production lines. 

1997/07-----
Start implementing Management Information System (MIS) in Taiwan. Meanwhile, ISO 9002 is applied for Shanghai Da Tong Corporation.

1998/05-----
QS 9000 quality standard system is guided in Taiwan. On the other hand, ISO 9002 is approved in Shanghai Da Tong Corporation. 

1999/03-----
QS 9000 quality standard system is approved. (Certificated by BSI U.K)


2000/05-----
Da Tong Corporation starts to be guided by TIK Taiwan and becoming qualified supplier for U.S Carrier Corporation.

2001/04-----
Use new metallographic microscope and digital piston profile instrument.

2002-----
ISO/TS 16949 is guided in Taiwan. At the same time, implementing new equipment for anti crown melting and enhance crown hardness.

2004-----
ISO/TS 16949 quality standard system is approved. Start developing forged piston for racing cars.

2005-----
Piston Skirt printing equipment is used in both Taiwan and China factories. Start producing piston cylinder bore diameter with 180 mm.

2006---
Continually expanding Shanghai Da Tong Corporation.



2007----
Da Tong factory is expanded as 4 new factories with 2000 . New performance measurement system is loaded. Implement alfin ultrasonic inspection equipment.

2008----
Whole new warehouse is developed with 2400 in Taiwan. Also, new equipment for casting is designed. Implement bronze bushing insert equipment.

2009---
Taiwan factory start designing and developing 200 mm pistons and bi-metal piston. Continually improves the MIS System.

2010---
Start implementing automatic casting equipment and implementing 4-spindle CNC lath for racing pistons.
--------------------------------------------------------------------------------------------------------------------------------
Add: No.12 Lane 848, Sec. 1, Jungshan Rd., Hunei Shiang, Kaohsiung, Taiwan 829, R.O.C
Factory Add:No. 55, Alley 18, Lane 848, Sec. 1, Jungshan Rd., Hunei Shiang, Kaohsiung, Taiwan 829, R.O.C.
Tel: 886-7-6932222•6932261 Fax: 886-7-6932226